Your Name
*
Company
*
E-mail
*
Phone
*
Project Address (Please include City & Zip)
*
You are the
*
Please Select
HVAC Contractor
Architect
Builder
Project Manager
Homeowner
Other
COMcheck Report
*
Yes
No
Please attach PDF of Floor plans, elevations & window/door schedule
Select File
Cancel
of
How many HVAC units? (estimate is ok)
*
1
2
3
4
5
6
7
8
Roof Type
*
Please Select
Ceiling under Attic (most common)
Flat (no attic)
Sloped (Cathedral)
Other (please specify in notes area)
Roof Color
*
Dark
Medium
Light
White
Roof Material
*
Please Select
Asphalt Shingles
Wood Shingles/Shakes
Tile, Slate or Concrete
Metal
Tar, Gravel
Membrane
Other (please specify in notes area)
Attic Type
*
Please Select
Unvented
Unvented w/ radiant barrier
Vented
Vented w/ radiant barrier
Fan vented
Fan vented w/ radiant barrier
Encapsulated (foam on roof decking)
Other (please specify in notes area)
Attic insulation
*
Please Select
R-13
R-15
R-19
R-22
R-30
R-38
Other (please specify in notes area)
Roof Insulation
*
Please Select
None
R-19
R-22
R-25
R-30
Window Frame Type
*
Metal
Wood
Clad Wood
Vinyl
Fiberglass
Window Panes
*
1
2
3
Window U-Factor
*
Window SHGC
*
Exterior Wall Type
*
Please Select
Brick
Metal
Wood
Vinyl
Stucco
Framing
*
2"x4" wood
2"x6" wood
2"x4" metal
2"x6" metal
Interior Finish
*
Please Select
None
1/2" gypsum board
5/8" gypsum board
3/4" wood
Metal
Wall Insulation
*
R-11
R-13
R-15
R-19
R-22
Other (please specify in notes area)
HVAC Type
*
Please Select
Split System w/Gas Furnace
Split System w/Heat Pump
Split System w/Electric Heat Strip
Package Unit w/Gas Furnace
Package Unit w/Heat Pump
Package Unit wi/Electric Heat Strip
Mini Split
Other (please specify in notes)
Duct Type
*
Please Select
Vinyl Flex
Fiberglass Ductboard
Sheet Metal
Duct Insulation
*
R-4
R-6
R-8
Other (please specify in notes area)
MISC HVAC Components
*
Please Select
None
Make-Up or Outdoor Air
ERV
HRV
Other (please specify in notes area)
Hours of Occupancy (example- 8am- 6pm)
*
Max Occupancy
*
Notes-
By submitting a project, you agree to the terms and conditions of Fresh Air HVAC Sizing/Earth Audits, LLC.. The report we provide is only as good as the information we receive. Please review all load calculations and reports you receive from us for accuracy. It is ultimately the HVAC contractor who is responsible for the equipment they install.
*
Yes, I accept these terms
No, I do not accept
After reviewing your project, you will receive a QuickBooks invoice that can be paid online. Projects must be paid for before work will begin. Our 5 day turnaround starts from the time of payment.
Submit
Should be Empty: