• Shoe Work Order Form v5.2

    Standard Fabrication 5 Business Days
    • Account Information  
    • Order Information  
    •  -  - Pick a Date
    •  -  - Pick a Date
    • Device  
    • Design  



    • Standard Grade Includes:

      Adding up to 10 mm (3/8") crepe then grinding in rocker

    • Mild Grade Includes:

      Adding up to 6 mm (1/4") crepe then grinding in rocker

    • Severe Grade Includes:

      Adding up to 13 mm (1/2") crepe then grinding in rocker

    • Finshing  

    • Additional Instructions  
    • AOPS Billing  
    • Should be Empty: