Architectural Control Committee Request Logo
  • Architectural Control Committee Request

  •  -
  • Attachments:

    Please attach the location of improvements with accurately drawn dimensional plat showing existing structures and proposed improvements.

     If you are requesting a residential structure, or significant new structure or addition to existing structure, please include a full set of architectural plans and elevations

     Please include any additional information that may help the ACC evaluate and process your request (such as attaching color swatches, pictures of current landscape, etc.)

  • Browse Files
    Cancelof
  • The ACC will meet and process your request within thirty (30) days of submission of the required documents.  

     

    The property owner is responsible for ensuring that the general contractor or appropriate vendor is licensed, insured and bonded and proper permits have been pulled.

     

    Neither the ACC nor any member thereof or agent thereof shall be liable to any owner or to any party for any damages, loss or prejudice suffered on account of the approval or disapproval of any plans, drawings, or specifications, whether or not defective, or the executions or filing of any motion, certificate, petition or protest in the courts of the US or with any other governmental board or body, whether or not the facts stated therein are true and correct.  Neither the ACC nor any agent thereof shall be responsible to check for any defects in any plans or specifications submitted, revised or approved in accordance with the CCR’s nor for any structural or other defects in any work done according to such plans and specifications.

     

  • Clear
  • Should be Empty: