• COTTON RANCH DESIGN GUIDELINES APPENDIX C JULY 2017

  • PRELIMINARY PLAN REVIEW CHECKLIST

  • Please review Section 8 – Plan Review Process for all required items.

  • The following checklist is supplied to help you and your design team prepare your submittal. Samples of all materials listed on this checklist must be submitted with a copy of this list or the application will be denied. Two complete sets (1 full size & 1-11x17 size) and one electronic copy of the drawings required:

  •  
  • Should be Empty: