• COTTON RANCH DESIGN GUIDELINES APPENDIX E JULY 2017

  • FINAL PLAN REVIEW CHECKLIST

    Please review Section 8 – Plan Review Process for all required items.
  • The following checklist is supplied to help you and your design team prepare your submittal. Samples of all materials listed on this checklist must be submitted with a copy of this list or the application will be denied. Two complete sets (36 x 24 size) and one electronic copy of the drawings required:

  • Note: These plans must be stamped by a structural engineer

  • Note: Plans will not be accepted for review by the DRC unless the Final Submittal is complete with all the required information indicated on the checklist and all fees and deposits are paid.

  •  
  • Should be Empty: